<![CDATA[Property Features:
- 1 Bedroom
- 2 Bathrooms
- Smart Home Features
- Brand New
- Private Balcony
- Covered Parking
- Swimming Pool
- Gymnasium
- 24/7 Security Surveillance
- Prime Location
Area
JVC District 10
Overview
Binghatti House JVC is a 27-storey residential building in JVC District 10, Jumeirah Village Circle, Dubai.
The developer
The project was developed by Binghatti Developers.
Timeline
Construction began in May 2023 and was completed by July 2024.
Key dates
Construction began in May 2023. The estimated handover date was July 2024. The project was completed in July 2024.
Master developer
The master developer is Nakheel.
The architect
The architectural consultant was Silver Stone Engineering Consultants.
The contractor
The main building work was done by Granada Europe Engineering Contracting Company and the foundation work was carried out by Power Axes Foundation.
Project value
According to the Land Department, the project was valued at AED 150,000,000 (USD 40.8m).
Transport & Access
Commute times by car
From Binghatti House JVC it takes roughly 19 minutes to drive to Dubai Mall, 13 minutes to Palm Jumeirah, 15 minutes to Burj Al Arab and 18 minutes to The Walk JBR.*
Airport proximity
Dubai International Airport (DXB) is roughly 23 minutes' drive and the new Al Maktoum International Airport is roughly 29 minutes' drive.*]]>
Binghatti House, Jumeirah Village Circle, Dubai
1 Bedroom Apartment for rent
75,000 AED Per Year
Binghatti House
Ref.No : AP9029